Zinc Dormer Loft Conversion

Riverside Townhouse

Twickenham, London · 2025

A restrained zinc dormer conversion to a Victorian terraced townhouse in Twickenham, adding a principal bedroom with ensuite and a Juliet balcony over the garden.

Riverside Townhouse, Zinc Dormer Loft Conversion
Type
Zinc Dormer Loft Conversion
Added floor area
410 sq ft
Bedrooms added
1
On site
12 weeks

The brief

A young family needed one more bedroom and a second bathroom, with the caveat that they did not want a loft that announced itself. The brief was for calm, simple rooms: plain walls, good light, no exposed structure on show, and a proper connection to the garden from the top of the house.

The challenge

Terraced roof space in Twickenham is tight. Head height at the ridge was modest, the party walls needed careful attention on both sides, and the rear garden was the only access route for materials. The dormer also had to satisfy permitted development limits on volume and set-back while still giving a usable, square-shouldered room rather than a sloped box.

Our response

We designed a narrower rear dormer clad in pre-weathered standing seam zinc, with a pitched roof that sits quietly within the original roof slope and concealed outlets so nothing interrupts the elevation. Full-height dark grey aluminium doors open onto a slim black steel Juliet balcony, which brings the garden into the room without taking floor area away from it. Internally the room is deliberately plain: flat plastered walls and ceiling, wide-plank oak floor, and no visible steel. The structure is there, it is simply not the subject.

Location & context

The house sits on a terraced street a short walk from the river and Twickenham station, one of a long, even run of yellow stock brick houses with slate roofs. The rear elevations are visible from the neighbouring gardens, so any new roof work has to be quiet, well proportioned and properly detailed.

The project, in full

How it came together.

The first decision was the dormer material. A rendered or tiled dormer on this elevation would have looked heavy against the slate, so we specified pre-weathered zinc in standing seam, which greys down to sit with the roof rather than against it. The seams give the box a vertical rhythm that keeps the width from reading as bulk.

The pitched roof was chosen to keep the dormer within the roof slope and avoid the bulky box look. Outlets run internally so there is no visible rainwater goods on the new work, and the zinc returns over the parapet in one continuous line.

Inside, we kept everything simple. The clients had seen a lot of loft conversions with beams and rafters on show and wanted none of it. The steel sits within the floor and behind the plasterboard, and the room reads as a proper first-class bedroom you might find on any floor of the house. The only detail we allowed ourselves is the deep reveal at the balcony doors, which frames the garden like a picture.

Access was through the side return and up the scaffold, with a protected route across the garden and every plant lifted and reinstated at the end. The family stayed in the house for the full twelve weeks.

Gallery

A quiet walk through the finished home.

Loft principal bedroom with plain plastered walls, oak floor and full-height doors onto a Juliet balcony
Principal bedroom, quiet walls, garden light through the balcony doors
Loft ensuite shower room with pale stone tiling, black framed screen and brushed brass fittings
Ensuite, pale stone, brushed brass, a rooflight overhead
New oak staircase and loft landing with painted balustrade and rooflight above
The new stair, top-lit, painted balustrade and oak handrail

Materials & finishes

  • ,Pre-weathered standing seam zinc cladding
  • ,Pitched zinc roof sitting within the original slate roof slope, with concealed outlets
  • ,Powder-coated aluminium doors, anthracite grey
  • ,Slim black steel Juliet balcony
  • ,Wide-plank engineered oak flooring
  • ,Flat plastered walls and ceilings, no exposed structure
  • ,Large format pale stone porcelain to the ensuite

Services delivered

  • ,Architectural design
  • ,Permitted development and building control
  • ,Structural engineering
  • ,Party wall coordination
  • ,Full build and project management
  • ,Zinc and slate roofing
  • ,Interior finishing

Programme

12 weeks on site.

Design and consents ran ahead of the build; the on-site programme was planned week by week.

  1. 01

    Design and planning

    Permitted development certificate of lawfulness

    8 weeks
  2. 02

    Structural design and party wall

    Both party walls, ran alongside design

    6 weeks
  3. 03

    Scaffold, strip-out and structure

    2 weeks
  4. 04

    Dormer framing, zinc and slate roof

    3 weeks
  5. 05

    First fix and plaster

    3 weeks
  6. 06

    Second fix, ensuite and finishing

    4 weeks

Sustainability

Insulation was specified well above the minimum, with a warm roof build-up under the zinc roofing to remove cold bridging at the dormer. Zinc is fully recyclable and was cut and folded on site to reduce offcuts. Existing slate removed from the rear slope was set aside and reused for repairs elsewhere on the roof.

Credits

Design and delivery
Elisha Homes
Structural engineer
Thames Valley Structures
Party wall surveyor
Richmond Party Wall
Zinc and slate roofing
In-house roofing team

In the client's words

We asked for a room that did not look like a loft, and that is exactly what we got. The balcony doors are open most mornings.
Mr & Mrs H. · Homeowners, Twickenham